{"id":2470,"date":"2021-05-19T06:13:11","date_gmt":"2021-05-19T06:13:11","guid":{"rendered":"https:\/\/zlqu95mfyr.wpdns.site\/?p=2470"},"modified":"2021-05-25T08:51:34","modified_gmt":"2021-05-25T08:51:34","slug":"how-to-install-a-steel-door","status":"publish","type":"post","link":"https:\/\/www.avido.cn\/fr\/how-to-install-a-steel-door\/","title":{"rendered":"Comment installer une porte en acier"},"content":{"rendered":"<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Temps de lecture estim\u00e9 :  <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-preparation-work-before-installation-and-related-cooperation-work\"><strong>Travaux de pr\u00e9paration avant l&#039;installation et travaux de coop\u00e9ration associ\u00e9s<\/strong><\/h3>\n\n\n\n<p>Avant l&#039;entr\u00e9e officielle, pr\u00e9parez les documents de qualification et la liste des installateurs et les certificats professionnels correspondants \u00e0 l&#039;entrepreneur principal pour examen.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>1. Pr\u00e9paration des installations temporaires&nbsp;<\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\"><li>Un entrep\u00f4t temporaire d&#039;au moins 1,5 m2 est pr\u00e9vu pour le stockage temporaire de machines de construction, d&#039;accessoires et d&#039;autres articles importants.<\/li><li>Les entrep\u00f4ts et bureaux temporaires doivent \u00eatre \u00e9quip\u00e9s d&#039;une alimentation \u00e9lectrique monophas\u00e9e temporaire pour l&#039;\u00e9clairage, les ventilateurs \u00e9lectriques, etc., d&#039;une capacit\u00e9 d&#039;au moins 1,5 kW.<\/li><li>Chaque chantier de construction dans un rayon de 50 m doit \u00eatre \u00e9quip\u00e9 d&#039;une connexion temporaire d&#039;alimentation 3-AC380v\/20A et d&#039;une connexion \u00e9lectrique monophas\u00e9e AC220\/10A et \u00e9quip\u00e9 d&#039;un interrupteur de protection contre les fuites \u00e0 la terre fiable pour assurer la s\u00e9curit\u00e9 de l&#039;\u00e9lectricit\u00e9 de construction.<\/li><\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>2. Dotation en personnel et pr\u00e9parations de s\u00e9curit\u00e9 connexes<\/strong><strong><\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\"><li>Le site est dot\u00e9 de superviseurs qualit\u00e9 et s\u00e9curit\u00e9 permanents.<\/li><li>Avant d&#039;entrer sur le site, le personnel d&#039;installation doit d\u00e9tenir \u00ab\u00a0cinq certificats et un seul\u00a0\u00bb, une carte d&#039;identit\u00e9, un permis de s\u00e9jour, un certificat de sant\u00e9, un certificat d&#039;exploitation et un permis d&#039;entr\u00e9e et de sortie, et faire une bonne \u00e9ducation et \u00e9valuation de la s\u00e9curit\u00e9 3, et faire de bons enregistrements .<\/li><li>Le personnel de s\u00e9curit\u00e9 \u00e0 temps plein de l&#039;entrepreneur g\u00e9n\u00e9ral combin\u00e9 avec l&#039;\u00e9ducation \u00e0 la s\u00e9curit\u00e9 du site r\u00e9el et fait un enregistrement.<\/li><li>Construction du site par l&#039;ensemble du site I responsable de la coordination et de la gestion, avec un agent de s\u00e9curit\u00e9 \u00e0 temps plein portant le logo du responsable de la s\u00e9curit\u00e9.<\/li><li>Soudeurs, \u00e9lectriciens titulaires d&#039;un permis d&#039;exploitation valide pour travailler, portent des \u00e9quipements de protection, respectent strictement la r\u00e9glementation incendie pour le certificat d&#039;incendie, \u00e9quip\u00e9s de certains \u00e9quipements d&#039;extinction d&#039;incendie.<\/li><li>\u00c9quip\u00e9 d&#039;outils de protection et d&#039;installations correspondantes pour une production s\u00fbre\u00a0; 2.7 Assurez-vous que la protection de mise \u00e0 la terre des outils \u00e9lectriques de construction et de la bo\u00eete de distribution \u00e9lectrique doit \u00eatre \u00e9quip\u00e9e d&#039;une protection contre les fuites \u00e9lectriques pour garantir qu&#039;aucun accident de choc \u00e9lectrique ne se produise.<\/li><\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>3. Pr\u00e9paration des mat\u00e9riaux auxiliaires<\/strong><strong><\/strong><\/h4>\n\n\n\n<p>Boulons \u00e0 expansion, cales en bois, plaques de raccordement. (joint), laine de roche ou laine min\u00e9rale, et ferrures sp\u00e9ciales pour portes blind\u00e9es et dispositifs associ\u00e9s, etc.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>4. Pr\u00e9paration des machines<\/strong><strong><\/strong><\/h4>\n\n\n\n<p>Table \u00e0 marteau \u00e9lectrique, niveau, pendentif fil magn\u00e9tique, bo\u00eetier d&#039;alimentation mobile monophas\u00e9, perceuse \u00e9lectrique type pistolet, m\u00e8tre ruban, niveau, cl\u00e9 \u00e0 douille sp\u00e9ciale, \u00e9clairage mobile, outils \u00e0 main courants, outils de protection de chantier.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>5. Mesures de garantie de construction civilis\u00e9e<\/strong><strong><\/strong><\/h4>\n\n\n\n<ul class=\"wp-block-list\"><li>Selon les besoins du projet, fournir et entretenir les installations d&#039;\u00e9clairage et de cl\u00f4ture pour la construction de nuit, et \u00eatre responsable de la s\u00fbret\u00e9 et de la s\u00e9curit\u00e9.<\/li><li>Se conformer aux r\u00e9glementations des d\u00e9partements gouvernementaux concern\u00e9s sur la circulation sur les chantiers de construction, le bruit de la construction, la protection de l&#039;environnement et la s\u00e9curit\u00e9 de la production.<\/li><li>Mettre en \u0153uvre le principe de production de celui qui est responsable de la construction.<\/li><li>Ob\u00e9ir aux dispositions de la gestion de la s\u00e9curit\u00e9 du chantier de construction de l&#039;entrepreneur et accepter l&#039;inspection et la supervision et les sanctions raisonnables de l&#039;entrepreneur principal.<\/li><li>Doit mettre en \u0153uvre consciencieusement les r\u00e8glements de construction civilis\u00e9s pertinents aux niveaux sup\u00e9rieurs et am\u00e9liorer la construction civilis\u00e9e du chantier de construction.<\/li><li>Doit \u00eatre \u00e9quip\u00e9 d&#039;un agent de s\u00e9curit\u00e9 \u00e0 temps plein avec un double permis de chantier afin que le personnel de construction avec un permis de travail.<\/li><li>Avant d&#039;entrer sur le site doit g\u00e9rer diverses proc\u00e9dures (y compris l&#039;entrepreneur g\u00e9n\u00e9ral aux proc\u00e9dures de passation de l&#039;entrepreneur).<\/li><li>Les r\u00e9glementations et ordonnances nationales pertinentes ainsi que les r\u00e8gles de gestion du site du ma\u00eetre d&#039;\u0153uvre doivent \u00eatre respect\u00e9es et les sanctions applicables doivent \u00eatre appliqu\u00e9es.<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Processus d&#039;installation et contr\u00f4le qualit\u00e9<\/strong><strong><\/strong><\/h3>\n\n\n\n<p>Avant l&#039;installation, choisissez un exemple de porte comme exemple d&#039;installation, une fois le processus termin\u00e9, faites un rapport \u00e0 la partie A, \u00e0 l&#039;entrepreneur g\u00e9n\u00e9ral, \u00e0 l&#039;acceptation et \u00e0 l&#039;\u00e9valuation du superviseur, puis continuez \u00e0 installer d&#039;autres produits selon les besoins.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>1. Processus d&#039;installation<\/strong><\/h4>\n\n\n\n<p>1. <a href=\"https:\/\/www.harsle.com\/Standard-Security-Steel-Door-Production-Line-pd77938287.html\" target=\"_blank\" rel=\"noopener\">Porte de s\u00e9curit\u00e9 en acier<\/a> processus d&#039;installation<\/p>\n\n\n\n<p>D\u00e9limitation et positionnement, correction du cadre, raccordement et fixation, colmatage des interstices, pose des portes, pose de la quincaillerie, nettoyage sanitaire (apr\u00e8s d\u00e9limitation et positionnement, installation du produit d\u00e9ballage, et nettoyage du lieu d&#039;installation)<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Positionnement du rayage\u00a0: selon la taille, l&#039;\u00e9l\u00e9vation et la direction d&#039;ouverture sp\u00e9cifi\u00e9es dans les dessins de conception, dans la cavit\u00e9 pour faire appara\u00eetre la ligne de position d&#039;installation du cadre de porte.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.avido.cn\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72472-1.png\" alt=\"\" class=\"wd-lazy-fade wp-image-2514\" width=\"350\" height=\"430\" title=\"\"><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Correction du cadre de support : le cadre de porte en place, doit \u00eatre corrig\u00e9 pour sa verticalit\u00e9 (cadre de porte et verticalit\u00e9 au sol, doit \u00eatre \u2264 2 mm \u00b0) et de niveau et en diagonale, selon les exigences de conception pour s&#039;adapter \u00e0 la hauteur d&#039;installation - coh\u00e9rente, et la distance entre le mur int\u00e9rieur et ext\u00e9rieur, la largeur du cadre de la porte de haut en bas, puis utilisez pour dessiner un coin en bois dans le cadre de la porte aux quatre coins du positionnement initial.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.avido.cn\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72473-1.png\" alt=\"\" class=\"wd-lazy-fade wp-image-2515\" width=\"350\" height=\"480\" title=\"\"><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Connexion fixe\u00a0: cadre de porte avec boulons \u00e0 expansion M10x 10 temporairement fix\u00e9s, doit \u00eatre examin\u00e9 pour s&#039;assurer que la taille de l&#039;installation est pr\u00e9cise. Cadre bouche. La taille de l&#039;erreur admissible doit \u00eatre 1,5 mm, l&#039;erreur admissible en diagonale doit \u00eatre \u2264 2,0 mm.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Installation de la porte, pour installer le ventilateur de la porte sur le cadre de la porte, ajustez sa position et le niveau.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>\u00c0 l&#039;avant et \u00e0 l&#039;arri\u00e8re, \u00e0 gauche et \u00e0 droite, de haut en bas dans six directions apr\u00e8s la bonne position, puis les boulons \u00e0 expansion avec une cl\u00e9 \u00e0 serrer.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Bloquez l&#039;espace: une fois le cadre de la porte connect\u00e9 au mur, retirez le coin en bois, utilisez de la laine de roche ou de la laine min\u00e9rale pour bloquer l&#039;espace entre le cadre et le mur, selon la structure diff\u00e9rente du cadre de porte, le cadre de porte surface sera laiss\u00e9e hors de la fente, avec du mortier de ciment. (Rapport mortier de ciment : M10) liss\u00e9 et compact\u00e9, ou rempli de mousse et scell\u00e9 avec du mastic.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.avido.cn\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72474-1.png\" alt=\"\" class=\"wd-lazy-fade wp-image-2516\" width=\"350\" height=\"400\" title=\"\"><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Jointoiement de cadre de porte: jointoiement de cadre de porte, et ainsi de suite jointoiement dur, ajustez le r\u00e9glage, puis le ventilateur de porte est install\u00e9.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Une fois la porte ferm\u00e9e, l&#039;espace doit \u00eatre uniforme, la surface doit \u00eatre plane. Apr\u00e8s l&#039;installation de la porte de s\u00e9curit\u00e9, exigez que le ventilateur de porte et le montant de recouvrement du cadre ne soient pas inf\u00e9rieurs \u00e0 10,0 mm, le ventilateur de cadre avec la largeur int\u00e9rieure de la partie de l&#039;\u00e9cart de taille ne d\u00e9passe pas 2,0 mm, l&#039;\u00e9cart de hauteur ne d\u00e9passe pas 2,0 mm, la diff\u00e9rence de longueur diagonale est inf\u00e9rieure \u00e0 3,0 mm, le ventilateur de porte est ferm\u00e9 et apr\u00e8s l&#039;\u00e9cart est inf\u00e9rieur \u00e0 3,0 mm, le ventilateur de porte et le cadre de porte entre les deux c\u00f4t\u00e9s de l&#039;\u00e9cart ne d\u00e9passent pas 4,0 mm, l&#039;\u00e9cart lat\u00e9ral sup\u00e9rieur n&#039;est pas plus de 3,0 mm, les doubles portes dans l&#039;espace ne d\u00e9passent pas 4,0 mm.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Installation du mat\u00e9riel\u00a0: l&#039;installation des serrures de porte, des poign\u00e9es et d&#039;autres dispositifs, etc.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.avido.cn\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72475-1.png\" alt=\"\" class=\"wd-lazy-fade wp-image-2517\" width=\"400\" height=\"450\" title=\"\"><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Nettoyer la sant\u00e9: apr\u00e8s la fin de l&#039;installation, le cadre de la porte, le ventilateur de la porte et la salet\u00e9 autour du trou doivent \u00eatre nettoy\u00e9s. Site de la porte apr\u00e8s l&#039;installation et avant l&#039;ach\u00e8vement de leur v\u00e9rification s&#039;il y a des rayures, telles que celles trouv\u00e9es \u00e0 temps pour r\u00e9parer, liste \u00e0 l&#039;entrepreneur g\u00e9n\u00e9ral. R\u00e9parez l&#039;endroit, avec un film protecteur pour faire un bon travail de mesures de protection pour \u00e9viter la pollution du mat\u00e9riel.<\/li><\/ul>\n\n\n\n<p>2. M\u00e9thode de connexion<\/p>\n\n\n\n<p>Le mur est renforc\u00e9 \u00e0 un intervalle de 500 mm et la connexion est pr\u00e9r\u00e9gl\u00e9e. 15 mm est r\u00e9serv\u00e9 pour chaque c\u00f4t\u00e9 du cadre de la porte et du mur, la surface horizontale est de 10 mm au-del\u00e0 du mur (ou selon les exigences de conception), et le cadre de la porte est connect\u00e9 au mur avec des boulons \u00e0 expansion et le p\u00e9rim\u00e8tre de la porte le cadre est rempli de mousse.<\/p>\n\n\n\n<p>3. Pr\u00e9cautions d&#039;installation<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>La surface des pi\u00e8ces pr\u00e9fabriqu\u00e9es dans le trou ne doit pas \u00eatre inf\u00e9rieure \u00e0 la surface du mur dans le trou, pour faciliter la connexion. En cas d&#039;individu inf\u00e9rieur \u00e0 la surface du mur, peut tamponner la connexion en fer.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Porte en acier sans seuil de porte, si la hauteur de l&#039;entr\u00e9e int\u00e9rieure du cadre de la porte est sup\u00e9rieure de 30 mm \u00e0 la hauteur de la porte, l&#039;extr\u00e9mit\u00e9 inf\u00e9rieure du cadre de la porte doit \u00eatre enterr\u00e9e sous le sol + 0,00 d&#039;\u00e9l\u00e9vation, pas moins de 20 mm.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Mousse de blocage avant solidification, ne permettre aucun travail sur l&#039;encadrement de la porte, pour \u00e9viter au mortier de se desserrer les fissures, diminuant la qualit\u00e9 de l&#039;\u00e9tanch\u00e9it\u00e9.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Le bouchage du cadre de porte avec des mat\u00e9riaux d\u00e9chirants, etc. doit \u00eatre \u00e9tanche.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>L&#039;installation de la porte en acier doit garantir la qualit\u00e9 de la connexion, pour que la porte en acier et le mur soient solidement tricot\u00e9s en un seul corps.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/www.thefabricator.com\/thefabricator\/article\/shopmanagement\/a-case-study-in-lean-manufacturing-opening-the-door-to-single-piece-flow\" target=\"_blank\" rel=\"noopener\">Pose de porte en acier<\/a> doit \u00eatre l\u00e9ger \u00e0 ouvrir et \u00e0 fermer, ni trop l\u00e2che ni trop serr\u00e9.<\/li><\/ul>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.avido.cn\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72476.png\" alt=\"\" class=\"wd-lazy-fade wp-image-2518\" width=\"400\" height=\"450\" title=\"\"><\/figure><\/div>\n\n\n\n<ul class=\"wp-block-list\"><li>Apr\u00e8s l&#039;installation, utilisez un tournevis pour v\u00e9rifier les vis de chaque partie de la quincaillerie et serrez-les fermement.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>La porte en acier install\u00e9e, la surface du ventilateur du cadre de la porte doit \u00eatre plate, aucun ph\u00e9nom\u00e8ne concave et convexe \u00e9vident.<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li>Surface du corps de la porte sans motif de brosse, gouttes ou pulv\u00e9risation de fleurs, de taches et d&#039;une autre maladie de la peinture.<\/li><\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>2. <\/strong><strong>Contr\u00f4le de la qualit\u00e9 dans le processus de construction<\/strong><strong><\/strong><\/h4>\n\n\n\n<p>Le personnel de construction (installateurs) doit surveiller strictement l&#039;auto-inspection et l&#039;inspection mutuelle entre chaque processus, le personnel de construction (installateurs) dans l&#039;ach\u00e8vement des travaux du processus en cours doit \u00eatre auto-inspect\u00e9 apr\u00e8s avoir pass\u00e9 le processus suivant, le prochain processus avant la mise en \u0153uvre , doit. Apr\u00e8s l&#039;inspection du personnel de construction (installateur) (inspection mutuelle) qualifi\u00e9, avant de poursuivre la construction, sinon devrait imm\u00e9diatement retravailler, ou notifier les inspecteurs concern\u00e9s \u00e0 traiter.<\/p>\n\n\n\n<p>Pendant le processus de construction, les inspecteurs concern\u00e9s doivent organiser une inspection de la gamme I en fonction de l&#039;avancement et de l&#039;importance du projet, pr\u00e9parer un plan d&#039;inspection si n\u00e9cessaire, effectuer une inspection al\u00e9atoire sur la qualit\u00e9 de la construction du projet et \u00e9tablir des enregistrements, collecter des informations non qualifi\u00e9es informations, trouver des informations non qualifi\u00e9es, sous forme de \u00ab\u00a0fiche de contact de travail\u00a0\u00bb ou de fiche de traitement, transmettre les informations non qualifi\u00e9es au d\u00e9partement du projet et \u00e0 tous les d\u00e9partements concern\u00e9s, par le d\u00e9partement responsable porte la coordination et la correction en temps opportun, si n\u00e9cessaire, mettre en \u0153uvre des \u00ab\u00a0mesures correctives et pr\u00e9ventives proc\u00e9dures de contr\u00f4le \u00bb.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.avido.cn\/wp-content\/themes\/woodmart\/images\/lazy.svg\" data-src=\"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72477-1.png\" alt=\"\" class=\"wd-lazy-fade wp-image-2519\" width=\"400\" height=\"450\" title=\"\"><\/figure><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Les mesures de protection des produits finis du site<\/strong><strong><\/strong><\/h3>\n\n\n\n<p>1. Une fois les produits transport\u00e9s sur le site, ils seront soigneusement empil\u00e9s dans la position correspondante en fonction des besoins et une personne sera affect\u00e9e \u00e0 leur entretien.<\/p>\n\n\n\n<p>2. Apr\u00e8s l&#039;installation du cadre de porte, la surface du film protecteur est fix\u00e9e pour \u00e9viter les rayures sur la surface du produit et faire les signes correspondants.<\/p>\n\n\n\n<p>3. Pour les parties sp\u00e9ciales du produit (telles que les all\u00e9es, les escaliers, etc.), 1 m en dessous de la pi\u00e8ce prendra les mesures de protection avec un couvercle en contreplaqu\u00e9, en contreplaqu\u00e9 de bois 3 c\u00f4t\u00e9s du couvercle de protection, et fix\u00e9 dans le cadre de la porte avec un montage pour s&#039;assurer que le produit pour \u00e9viter d&#039;endommager le site.<\/p>\n\n\n\n<p>4. Apr\u00e8s l&#039;installation de la porte, la surface de la porte sera prot\u00e9g\u00e9e par un film protecteur.<\/p>\n\n\n\n<p>5. Apr\u00e8s l&#039;installation du mat\u00e9riel, une personne sera affect\u00e9e pour inspecter la construction des produits endommag\u00e9s, les arr\u00eater imm\u00e9diatement et en fonction de la situation sp\u00e9cifique \u00e0 traiter.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Mesures correctives sur place<\/strong><strong><\/strong><\/h3>\n\n\n\n<p>1. Si le produit pr\u00e9sente des probl\u00e8mes de qualit\u00e9 ou d&#039;autres facteurs affectant la qualit\u00e9 du projet sur le site, il doit \u00eatre coordonn\u00e9 et trait\u00e9 rapidement et des mesures correctives doivent \u00eatre prises.<\/p>\n\n\n\n<p>2. Les endroits connect\u00e9s s&#039;av\u00e8rent l\u00e2ches et non fermement fix\u00e9s et tordus dans le temps.<\/p>\n\n\n\n<p>3. Tels que l&#039;\u00e9cart de production de cadre de porte, selon les sp\u00e9cifications d&#039;installation pour l&#039;installation des \u00abr\u00e8gles techniques d&#039;installation de s\u00e9curit\u00e9 en acier\u00bb, et la correction.<\/p>\n\n\n\n<p>4. Tels que l&#039;\u00e9cart de production de ventilateur de porte, par les sp\u00e9cifications d&#039;installation pour l&#039;installation et la correction.<\/p>\n\n\n\n<p>5. Cadre de porte et partie de soudure en acier galvanis\u00e9 par ventilateur de porte et partie endommag\u00e9e avec r\u00e9paration de peinture riche en zinc.<\/p>\n\n\n\n<p>6. Pi\u00e8ce de r\u00e9paration dans la peinture r\u00e9par\u00e9e, d&#039;abord enduite de peinture anti-corrosion.<\/p>\n\n\n\n<p>7. S&#039;il y a un \u00e9cart dans le rev\u00eatement du mat\u00e9riel, corrigez-le conform\u00e9ment aux sp\u00e9cifications d&#039;installation du mat\u00e9riel jusqu&#039;\u00e0 ce qu&#039;il r\u00e9ponde aux exigences.<\/p>\n\n\n\n<p>8. Le produit dans le processus d&#039;installation, le processus cach\u00e9 et l&#039;inspection interm\u00e9diaire, tels que l&#039;apparition de non-conformit\u00e9 aux exigences de qualit\u00e9, \u00e0 rectifier.<\/p>\n\n\n\n<p>9. Chaque porte en cours de mise en service, comme constat\u00e9 qu&#039;il n&#039;y a pas de r\u00e9pondre aux exigences de performance de l&#039;endroit \u00e0 rectifier.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Programme d&#039;acceptation et de livraison<\/strong><strong><\/strong><\/h3>\n\n\n\n<p>1. Apr\u00e8s l&#039;installation du cadre de porte, pour les proc\u00e9dures d&#039;inspection pertinentes, testez le cadre de porte et la connexion murale et d&#039;autres travaux connexes.<\/p>\n\n\n\n<p>2. Une fois les travaux cach\u00e9s accept\u00e9s, l&#039;installation du ventilateur de porte sera effectu\u00e9e et une fois le ventilateur de porte install\u00e9, l&#039;inspection interm\u00e9diaire sera effectu\u00e9e.<\/p>\n\n\n\n<p>3. Apr\u00e8s l&#039;installation, chaque produit doit \u00eatre test\u00e9 et inspect\u00e9 par l&#039;inspecteur qualit\u00e9, et seulement apr\u00e8s avoir pass\u00e9 les proc\u00e9dures d&#039;inspection.&nbsp;<\/p>\n\n\n\n<p>4. Apr\u00e8s l&#039;installation, des proc\u00e9dures d&#039;inspection en temps opportun seront effectu\u00e9es et chaque lot de produits sera remis selon le \u00ab\u00a0transfert de produit. Le contenu du \u00ab\u00a0bon de commande\u00a0\u00bb sera sign\u00e9 par la partie A et approuv\u00e9 comme base de livraison.<\/p>","protected":false},"excerpt":{"rendered":"<p>Avant l&#039;entr\u00e9e officielle, pr\u00e9parez les documents de qualification et la liste des installateurs et les certificats professionnels correspondants \u00e0 l&#039;entrepreneur principal pour examen.<\/p>","protected":false},"author":1,"featured_media":2520,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[710],"tags":[725,723,724],"class_list":["post-2470","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-metal-security-doors","tag-iron-door","tag-steel-door-installation","tag-steel-security-doo"],"jetpack_featured_media_url":"https:\/\/www.avido.cn\/wp-content\/uploads\/2021\/05\/\u56fe\u72471-1.png","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/posts\/2470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/comments?post=2470"}],"version-history":[{"count":0,"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/posts\/2470\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/media\/2520"}],"wp:attachment":[{"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/media?parent=2470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/categories?post=2470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.avido.cn\/fr\/wp-json\/wp\/v2\/tags?post=2470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}